EN10216-2 Steel Pipe
-
Payment
-
Origin
China Mainland
-
Minimum Order
1
-
Packing
Pieces
- Contact Now Start Order
- Description
Product Detail
Cold finished and stress-relieved annealing BKS(+SR)
Annealed GBK(+A)
Normalized NBK(+N)
Changzhou Hongtai Precision Steel Pipes Co. is a professional steel pipe trading company; we have rich experience in exporting pipes and can always provide the solutions for our customers, it is our honor to serve you.
Product Name | P195 GH steel pipe | P235 GH steel pipe | P265 GH steel pipe |
chemical analysis | C: 0.13;Si: 0.35;Mn: 0.70;P: 0.025; S: 0.020;Cr: 0.30;Mo: 0.08;Ni 0.30 | C: 0.16;Si: 0.35;Mn: 1.20;P: 0.025; S: 0.020;Cr: 0.30;Mo: 0.08;Ni 0.30 | C: 0.20;Si: 0.40;Mn: 1.40;P: 0.025; S: 0.020;Cr: 0.30;Mo: 0.08;Ni 0.30 |
Tensile Strength | & 195 | T 16mm, & 235MPa; 16 T 40mm,& 225MPa; 40 T 60mm, & 215MPa | T 16mm, & 265MPa; 16 T 40mm,& 255MPa; 40 T 60mm, & 245MPa |
Yield strength | 320-440 | 360-500 | 410-570 |
Standard | EN10216-2 | ||
Length | As customer s request | ||
Packaging | Standard export packing, packed in woven bags, with two nylon slings, or can be customized as request | ||
Heat Treatment/ Delivery Condition | Heat treatment is applied following the last cold forming process. Subject to appropriate processing conditions, the increase in the residual stresses involved enables both forming and machining to a certain degree. The last Cold forming process is followed by annealing in a controlled atmosphere. The last cold forming process is followed by annealing above the upper transformation point in a controlled atmosphere. | ||
Delivery Time | Within 35-50 days from receiving deposit | ||
Payment Term | 100% L/C at sight or 30% deposit, 70% balance against copy of B/L | ||
Usage/Application | Pipes for boiler and superheater | ||
Main Market | Asia, Middle East, Europe, etc. |
- GB5310 Steel Pipe 1 Pieces / (Min. Order)
- DIN17175 Steel Pipe 1 Pieces / (Min. Order)
- ASTM A213 Steel Pipe 1 Pieces / (Min. Order)
- ASTM A210 Steel Pipe 1 Pieces / (Min. Order)